Baker Hughes has been awarded a semipermanent work statement by the ANOH Gas Processing Company (AGPC) to enactment the cognition of the ANOH Gas Processing Plant successful Nigeria.
The declaration includes the proviso of spare parts, repairs, engineering advisory services and integer enactment for the facility's turbomachinery, notably its 2 NovaLT16 state turbines.
The scope of the statement extends to the proviso of iCenter integer services utilizing the Cordant platform, which volition beryllium utilised for distant monitoring and diagnostics. This is intended to assistance amended the reliability and availability of the instrumentality astatine the plant.
Engineering enactment volition beryllium delivered locally done the company's work centre successful Port Harcourt, wherever section unit negociate beingness rhythm services.
Baker Hughes main maturation and acquisition serviceman and concern and vigor exertion interim enforcement vice-president Maria Claudia Borras said: "This semipermanent statement is simply a testament to our palmy collaboration with ANOH Gas Processing Company and the spot placed successful our beingness rhythm work capabilities.
"We are leveraging our determination expertise and pairing it with our precocious integer technologies and services, supporting the transportation of reliable, businesslike and affordable powerfulness solutions and helping Nigeria realise its extremity to determination to lower-carbon substance sources."
The statement continues the collaboration betwixt Baker Hughes and AGPC.
In 2019, Baker Hughes delivered an integrated powerfulness land solution to the ANOH facility.
This included 2 NovaLT16 state turbines, marking the archetypal clip these units were supplied successful sub-Saharan Africa. The 2019 proviso besides covered compressors and gears.
The ANOH Gas Processing Plant is an important portion of Nigeria's effort to make its earthy state resources for powerfulness procreation and concern use, supporting a gradual displacement towards cleaner-burning hydrocarbons.
The midstream installation is designed to instrumentality bedewed state from the ANOH tract and process it into thin state and liquefied petroleum state (LPG), with condensate produced arsenic a secondary output.
The installation is being developed successful 2 phases, each with a capableness of 300 cardinal modular cubic feet per time (mscf/d), for a full of 600mscf/d erstwhile afloat operational.
Stabilised condensate is expected to beryllium exported from the works to the Bonny Export Terminal.
Phase 1 of the task achieved its archetypal state transportation successful January 2026. It includes state processing, compression, LPG recovery, condensate stabilisation and supporting infrastructure.

1 week ago
14





English (CA) ·
English (US) ·
Spanish (MX) ·